Posts

Showing posts with the label Oscar Jimenez

Oscar Jimenez 12/7/18

I was all over the building today. First i started the off normally with scanning shippers. Then Sabrina asked me to do the mailers up at contracting. After that I helped Jeff in the Steel second floor with organizing some projects and blueprints. Lastly I folded up blueprints.

Oscar Jimenez 12/10/18

Today was a normal day as I did the usual work of scanning shippers and folding shippers. I used the gym again today and I am glad as to how much and how good the equipment there is in the gym. Things have been stressful at school as the holidays are approaching and teachers are giving out big assignments.

Oscar JImenez 12/7/18

Today it was a standard day. I came in and started scanning the shippers which took most if the morning. During my lunch I started to use the gym. The equipment was great and I'm glad I went. After lunch I started folding blueprints that are to be sent to the customers.

10-29-18

Today I started working in the new Steel offices. It was nice since I had to work in the kitchen due to the lack of desks. There are only four desks and the rest of the steel guys are up in Contracting. I started on my usual work, shippers, and they kept on coming in regularly. During the day there were many power outages, once there was a really big one that made my computer reboot and was very annoying. All in all it was a pretty interesting day.

4/18/18

Today went by quick. I came in and started working on a renaming blueprints it took most of my morning and after I finished with that I worked on something new. I put in different purchases that Ideal steel made and totaled them up and entered them into FabSuite. After lunch I helped Pat set up for an event. The day went by really quick.

Oscar Jimenez 3/22/18

Today was a busy day. I cam in and started working on scanners like normally. After that Steve Pedley gave me a new assignment which was to look at the contract drawings and FabSuite and make sure that the revisions were up to date, then I combined the files and moved them to a different file. Then I helped Alex labeling the mailers and stamping them. Finally I finished the rest of the scanners.It was a busy day

3/12/18

Today was a normal work day. I was dropped off by a different car than the last as the school is inconsistent in what driver I get. I came in put my lunch in the fridge and said hi to the steel guys. There was a lot of snacks from leftover St. Patrick day celebrations so I helped myself. I started doing the shippers and scanning them in. I did that for the rest of the day. 

11/30/17

Today was pretty busy. I came in and Pat told me that they had put a picture of me on the board running in a cross country meet. I thought that it was cool and was glad that they put it up. I came in and started working on shippers for Tony. After I finished that there was nothing for me to do at steel so I asked Melanie if she had stuff for me to do and she showed me to insert order numbers from job partners about deliveries. I did that till noon where I helped carry and set up lunch for the Movember celebration. it was fun to see everyone grow their mustaches and my favorite was Gaetano's picture because he looked exactly like Frank. After lunch I helped Steve mail invoices.

11/9/17

Today I came in and worked on the shipper scans. After I started working on that I went to take down the decorations from the Green Halloween. It was a trailer that was full of decorations that needed to be taken down. After that I finished the shippers that needed to be put in the correct folders.

10-19-17

Today I came in and started working on the shippers. I scanned them and put them in their file. After I finished that I started working on naming the architectural files and there was a lot. I did the same with the structural files. After that I updated the job classification list with more job descriptions. today was fairly busy and went by pretty fast.

10/12/17

Today I worked on a project which was to clean up a job classification document. It was 8 different jobs that I had to type up and make it sound more concise. This took me all of the day. Sylvia gave me tacos for lunch which was great and I'm grateful.

9-25-17

Today I worked mainly with Steve Pedley. I had to print different sets of steel projects from the plotter which is the big printer in the shield area. After I printed I had to staple each set and roll them up. I added contacts to Steve's phone. Later I updated hours into the Ideal Steel production schedule. Finally I learned how to change the paper for the plottter.

9/21/17

In the morning I helped Steve Pedley with printing out things for him but could not due to technical difficulties. So IT tried to help but had to leave for before they could figure out what was wrong. Later I went to do scans for Tony. After that I gathered blueprints and rolled them up for Steve. Overall today has been a good day.